Insights: Plain-English guides to construction scheduling.

Practical explanations of how schedules are built, updated and analyzed — written for the people who rely on them, whether or not they ever open the software.

All guides

Change & delay

Time impact analysis, explained

What a time impact analysis is, when a contract requires one, how to build the fragnet step by step, a worked example, and the mistakes that get TIAs rejected.

7 min read

Reporting

The schedule narrative: example and outline

What a construction schedule narrative is, what owners expect at baseline and at each monthly update, a full written example, and a reusable outline.

6 min read

Planning

Baseline schedule review checklist

A practical checklist for building or reviewing a construction baseline schedule: scope, logic, constraints, durations, float, calendars and critical path.

6 min read

For owners

How to read a schedule update

A guide for owners and project managers: eight questions that show whether a monthly schedule update is telling the truth about progress and the finish.

5 min read

Field planning

How to build a 3-week look-ahead

How to build a three-week look-ahead schedule from your CPM schedule and run the weekly meeting from it. Includes a free Excel look-ahead template.

6 min read

Change & delay

Delay analysis methods compared

The main construction delay analysis methods compared: how each works, the schedules and records it needs, where it is weak, and how to choose between them.

9 min read

Change & delay

Notice of delay: what to send and when

What a notice of delay in construction is, when it has to be given, what to put in it, a short sample, and how the schedule supports it.

8 min read

Change & delay

Weather days in a construction schedule

How to plan for normal weather in a baseline schedule, record weather days during the job, and show when unusually severe weather supports a time extension.

8 min read

Change & delay

Recovery schedule vs. acceleration

Recovery and acceleration both mean finishing sooner than the current forecast. The difference is who caused the delay — and that usually decides who pays.

5 min read

For contractors

When to hire a scheduling consultant

Seven signs it is time to hire a construction scheduling consultant, how outsourcing compares with an in-house scheduler, and ten questions to ask first.

5 min read

Change & delay

Who owns the float?

Float ownership explained: what float is, the three ways contracts assign it, why it decides time extensions, and a worked example of first-come, first-served.

5 min read

Planning

Cost-loaded schedules, explained

What a cost-loaded construction schedule is, who requires one, how to build it from the schedule of values, how it drives pay applications, and common mistakes.

5 min read

Software

Retained logic vs. progress override

What retained logic and progress override do to out-of-sequence work in Primavera P6, a worked example, which one specifications require, and the better fix.

5 min read

Software

Critical path vs. longest path in P6

How Primavera P6 marks critical activities by total float or by longest path, why the two lists differ, which to use, and how to check both.

8 min read

Fundamentals

What is a CPM schedule?

A plain-English guide to CPM scheduling in construction: activities, logic, the forward and backward pass, float and the critical path, with an example.

6 min read

Software

Primavera P6 vs. Microsoft Project

How Primavera P6 and Microsoft Project differ for construction CPM schedules — calculation, baselines, coding, file exchange — and how to choose.

5 min read

Free templates

Three files to go with the guides

A three-week look-ahead template and a baseline schedule review checklist in Excel, and a schedule narrative template in Word. Each one comes from a guide on this page.

See the free templates

Excel and Word · No sign-up · No macros

Reference

54 scheduling terms, defined without jargon.

Float, fragnet, data date, longest path. A searchable glossary of the words that turn up in schedule narratives, specifications and delay claims.

Open the glossary

Rather ask a person?

If a guide raises a question about your own project, a 30-minute call is usually the fastest way to an answer.

Request a free consultation

Free 30-minute consultation

Bring your schedule, your spec or just your questions.

Thirty minutes with a scheduler, no obligation. We will look at where your project stands and tell you plainly what would help.

Call Free consultation