Free baseline schedule review checklist for Excel: Fourteen checks that keep their own count.

A free Excel workbook for reviewing a contractor’s baseline schedule, or for checking your own before it goes out. It lists the 14 checks from our guide, colors each result as you choose it and counts what has passed, what has failed and what is still open.

Excel workbook (.xlsx) · 16 KB · No sign-up · No macros

The baseline schedule review checklist open as a spreadsheet: fourteen checks in four groups with what to look for in each, and columns for the result, the finding, a priority and the response needed. Three example rows are filled in
The Checklist sheet, with three example rows to type over. The project named at the top is made up for illustration.

What is inside

Six things built into the workbook.

The 14 checks from the guide

In four groups: completeness, logic, durations and calendars, and results. Beside each check is the guide’s own line on what to look for.

A result for every check

Choose Pass, Fail or N/A from a list, and the cell turns green, red or gray.

A count that keeps itself

One line shows how many checks have passed, failed, do not apply and are still open, and the percentage you have reviewed.

Room for the finding

A column for what you found, a priority of High, Medium or Low, and the response you need from the scheduler. Three example rows show the idea.

The DCMA 14-point thresholds

On a second sheet, type the metrics your scheduling software reports. Eleven are compared with the common threshold for you. Three are a judgment, so you choose Yes or No. A line counts how many of the 14 are met.

Laid out to print

US Letter, landscape, one page wide, with the column headings repeated on each page. A third sheet explains how to use the workbook.

Free download

Baseline schedule review checklist

Free to use and to adapt on your own projects.

Download the checklist

Excel workbook (.xlsx) · 16 KB · No sign-up

How to use it

From the schedule file to a written review, in eight steps.

  1. Fill in the details

    Type the project, the schedule file or its data date, your name and the date in the cream cells at the top.

  2. Work down the checks

    There are 14, in four groups: completeness, logic, durations and calendars, and results. The “What to look for” column explains each one.

  3. Choose a result

    Pick Pass, Fail or N/A from the list. The cell colors itself, and the summary line keeps count of what is left.

  4. Write what you found

    For a Fail, say what is wrong and where, with activity IDs if you can. Three rows are filled in as examples. Type over them or clear them.

  5. Set the priority

    Pick High, Medium or Low, so the scheduler knows what to fix first.

  6. Ask for a response

    Under “Response needed,” write what would close the finding: a correction, an explanation in the narrative, or a revised schedule.

  7. Add the metrics

    The second sheet is for the DCMA 14-point metrics your scheduling software reports. Type each result in its cream cell, and it is compared with the common threshold.

  8. Send the review

    Print the checklist or save it as a PDF, and send it with your comments. Keep a copy with the schedule file it describes.

Beyond the checklist

When the review needs a scheduler.

A checklist tells you what to look for. It cannot open the schedule file, trace the logic or judge whether a duration can be met. Someone still has to read the schedule, activity by activity.

That is the part we do. For contractors, we build the baseline with your project team, run these checks before it goes out and respond to the reviewer’s comments. For owners, we review a contractor’s baseline against the contract and return written comments you can send.

How our baseline schedule service works

Independent schedule review for owners

Common questions

Questions, answered.

Is the baseline schedule review checklist really free?

Yes. There is no form, no email address and no trial period. Download it, use it on your own projects and change it to suit them.

Does the checklist use macros?

No. It is a plain .xlsx workbook built with standard functions such as COUNTIF, with conditional formatting coloring the results. There are no macros to enable. Excel may ask you to click Enable Editing first, as it does with any downloaded file.

Will it work in Google Sheets or Numbers?

It is an Excel workbook (.xlsx). We have not tested it in Google Sheets or Numbers, so we can’t promise the drop-down lists and the colors behave the same way there.

Does it work for both Primavera P6 and Microsoft Project?

Yes. The checks are about the schedule, not the software, and the guide they come from covers both. Nothing is imported: you read the answers off your own schedule and record them in the workbook.

Are the DCMA 14-point thresholds a pass-or-fail test?

No. They are common screening thresholds, and your contract’s own specification governs. A threshold missed is a prompt to look, not a verdict. A schedule can pass all fourteen and still be unbuildable.