Primavera P6 scheduling services: P6 schedules, without the P6 overhead.

Your contract calls for Primavera P6. You don’t have to buy licenses or train staff to comply. We build and maintain the schedule in P6, and give your team layouts they can read without it.

When the contract says P6

The platform most large contracts name — and few contractors need full time.

Oracle Primavera P6 is the scheduling platform most often named in large private, public and federal construction contracts. It handles big networks, multiple calendars, cost and resource loading and baseline comparison well. It also has a learning curve that makes little sense for a contractor who needs it on one job.

We do the P6 work: activity coding, logic, calendars, cost loading, updates, and the reports the specification asks for. You get the native .xer file of every schedule we build or update, and PDF layouts for everyone who doesn’t have the software.

What good P6 work looks like

The settings and structure reviewers check first.

Settings that match the specification

Retained logic or progress override, the critical path definition and calendar assignments are set the way the contract requires, and stated in the narrative.

A clean structure

A work breakdown structure and activity codes for area, phase, trade and responsibility, so the schedule can be filtered the way people ask questions.

Cost and resource loading

Costs tied to the schedule of values, with cash-flow curves and earned-value reports that reconcile to the pay application.

Layouts people can read

Full schedule, critical path, milestone and look-ahead layouts, exported as PDF for the people who will never open P6.

XER health checks

Open ends, constraints, lags, out-of-sequence progress and changes since the last file — whether the schedule is yours or one you received.

Careful file handling

XER exports for the owner, PDFs for the field, and Microsoft Project conversions where a project partner needs them.

Common questions

Questions, answered.

Do we need to buy Primavera P6?

No. We hold the software and do the work. You receive the native file and PDF reports for every schedule we build or update.

What is an XER file?

XER is Primavera P6’s export format. It contains the schedule itself — activities, logic, calendars, resources and codes — which is why owners ask for it instead of a PDF. A baseline attached for comparison is not part of the export; it is sent as a file of its own.

Can you convert a Microsoft Project schedule to P6?

Yes. Conversion is rarely clean: calendars, constraints and lags all need checking. We review the logic after import and tell you what changed.

Which P6 settings matter in a contract schedule?

Two change the calculated dates: how out-of-sequence progress is handled (retained logic or progress override) and which calendars activities use. A third changes which activities are reported as critical without moving any date: whether the critical path is defined by total float or longest path. Specifications often fix all three, and the narrative should state them.