Free construction scheduling templates: Three templates, free to use and adapt.
A look-ahead and a baseline review checklist in Excel, and a schedule narrative in Word. Each one comes from one of our guides and opens with a worked example to type over. There is no form to fill out, and there are no macros.
The templates
-
Three-week look-ahead template
The next three weeks of work for the weekly coordination meeting, one task to a row. Type a start date and working days, and each bar draws itself beside a constraint log.
-
Schedule narrative template
The written report that goes with each monthly schedule update. It opens with ten headings, an instruction under each and a worked example to write over.
-
Baseline schedule review checklist
For reviewing a contractor’s baseline schedule, or checking your own before it goes out. Fourteen checks in four groups, a count that keeps itself and the DCMA 14-point thresholds on a second sheet.


